@extends('layouts.usermain') @section('main-container')
| Particulars | Avg Length (mtr) | Avg Bottom Width (mtr) | Avg Height (mtr) | Top Width (mtr) | Slant Length (mtr) | Frequency | Dressing Area (sqm) |
| Avg/Total | |||||||
| Estimated Dressing Area | |||||||
| Payable Quantity | |||||||
| Remarks for bund and bund volume | |||||||
| Particulars | Avg Length (mtr) | Avg Width (mtr) | AVG Thickness/Dia (mtr) | Qty(Cum) |
| Hume Pipe's Length and Diameter | ||||
| Estimated qty(m) | ||||
| Payable quantity (m) | ||||
| Deduction of hume pipe | ||||
| Masonry work after deduction of hume pipe volume (Cum) | ||||
| Estimated qty | ||||
| Payable Quantity (after deduction) | ||||
| Avg Length (mtr) | Avg Width (mtr) | Avg Depth (mtr) | Qty (Cum) |
| Estimated silt trap qty | |
| Payable Quantity |
| Avg Length (mtr) | Avg Width (mtr) | Avg Depth (mtr) | Qty (Cum) |
| Estimated Qty | |
| Payable Quantity |
| Avg Length (mtr) | Avg Width (mtr) | Qty (Sqm) |
| Estimated Qty | |
| Payable Quantity |
| Particulars | Avg Length (m) | Avg Width (m) | AVG Thickness/Depth (m) | Qty |
| Size of Display Board | ||||
| Earth Work Excavation (Cum) | ||||
| Estimated qty of excavation(Cum) | ||||
| Payable quantity(Cum) | ||||
| Brick Work - Foundation | ||||
| Brick Work - Superstructure | ||||
| Total brick work (Cum) | ||||
| Estimated brick work qty(Cum) | ||||
| Payable quantity (cum) | ||||
| Plaster Work (Sqm) | ||||
| Estimated plaster work qty (Sqm) | ||||
| Payable quantity (Sqm) | ||||
| Wall Writing with Synthetic Paint (Sqm) | ||||
| Estimated wall writing qty (Sqm) | ||||
| Payable quantity (Sqm) | ||||
| Remarks for Inlet, Outlet and Display board work | ||||
| Description | No. | Length (m) | Breadth (m) | Area (sqm) |
| Bund 1 | ||||
| Bund 2 | ||||
| Bund 3 | ||||
| Bund 4 | ||||
| Inlet Portion | ||||
| Total Area (sqm) | ||||
| Estimated Grass Turfing Area (sqm) | ||||
| Payable Quantity (sqm) | ||||