@extends('layouts.main') @section('main-container')
| Sr. No | Particulars | Unit | Rate |
|---|---|---|---|
| 1 | Earthwork in excavation(in Mass) in any kind of soil including hard soil, slushy muck, hard moorum soil with the help of crawler mounted Excavator like Poclain / Tata Hitachi up to a depth of 3.00 Metre from the existing bed level for digging of pond, Trench cum bund (TCB)and Field bunding (FB) & disposing/ removing the excavated spoil on the bund (Spoil-bank) as per direction and upto a dist. of 1000.00 Metre, with the help of required dumpers. Rate should include for excavation by Mechanical excavator & disposing the excavated spoil by Dumpers, Marching time of Mechanical equipments. | ||
| Excavation for pond | Cum | ₹ {{ number_format($rateSheet->pond_earth_work ?? 0, 2) }} | |
| 2 | Fine Dressing & Levelling of the excavated spoil on bund(spoil-bank) with the help of Mechanical excavator for proper compaction & finally by manual labour as per direction.Rate should include the earth cutting & filling to suit the site requirement | Sqm | ₹ {{ number_format($rateSheet->bund_dressing_and_compaction ?? 0, 2) }} |
| 3 | Outlet work- Supplying & laying NP2 RCC spun pipe 300mm dia with collar in lines and level and providing approved jointing materials and joint properly as per direction of E/I | RM | ₹ {{ number_format($rateSheet->outlet_hume_pipe ?? 0, 2) }} |
| 4 | Supplying, constructing random rubble masonry work using trap stone boulders of 200 - 300 mm size in cement sand mortar (1:6) in foundations, super structure, manholes, ducts, drains etc including fair cutting, waste, bonding, plumbing, lining, levelling, flushing, raking joints, scaffolding and curing, all as per drawings, specifications and directions of the Engineer/ Consultant, all materials, tools, plant and labour complete in all respect | Cum | ₹ {{ number_format($rateSheet->outlet_masonry ?? 0, 2) }} |
| 5 | Silt trap earthwork in excavation | Cum | ₹ {{ number_format($rateSheet->earth_work_for_silt_trap ?? 0, 2) }} |
| 6 | Inlet Pitching Work- Earth work excavation in ordinary soil --- do--- dressing of soil as per direction of E/I. | Cum | ₹ {{ number_format($rateSheet->inlet_earthwork ?? 0, 2) }} |
| 7 | Inlet Stone Pitching-Supplying and laying (properly as per design and drawing) rip-rap with good quality of dry boulders (200 - 300 mm size) duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction E/I. | Sqm | ₹ {{ number_format($rateSheet->inlet_stone_pitching ?? 0, 2) }} |
| 8 | Display Board (1m x 1m x 0.3m) | 1 NOS | |
| 8.A Earth work in excavation (for Display Board) | Cum | ₹ {{ number_format($rateSheet->display_board_earthwork ?? 0, 2) }} | |
| 8.B Supplying, constructing one or more brick thick burnt clay brickwork (Foundation and Superstructure) | Cum | ₹ {{ number_format($rateSheet->display_board_brick_work ?? 0, 2) }} | |
| 8.C Supplying and laying plaster with (1:6) cement sand mortar at and at all heights and depths above and below finished ground level to faces of walls, pillars, columns, a) 12 mm thick (in one operation) | Sqm | ₹ {{ number_format($rateSheet->display_board_plaster ?? 0, 2) }} | |
| 8.D Wall writing with synthetic paint as per guidance of site in-charge | Sqm | ₹ {{ number_format($rateSheet->display_board_wall_writing ?? 0, 2) }} | |
| 9 | Grass Turfing | Sqm | ₹ {{ number_format($rateSheet->grass_turfing ?? 0, 2) }} |
| 10 | GST | 18.00% | |