@extends('layouts.usermain') @section('main-container')
Measurement Sheet
@if (session('success')) @endif
@csrf
Water Harvesting Structure
@php $planning = $postLevel->baseline->waterHarvestingStructuresPlanning->first(); @endphp

Beneficiary

Work Items

S.N Particulars Unit Qty Rate Amount (Rs) Remarks
1 Earthwork in excavation (in Mass) in any kind of soil including hard soil, slushy muck, hard moorum soil...
Excavation for pond
2 Fine Dressing & Levelling of the excavated spoil...
3 Outlet work – Supplying & laying NP2 RCC spun pipe...
4 Supplying, constructing random rubble masonry work...
5 Silt trap earthwork in excavation
6 Inlet Pitching Work – Earthwork excavation...
7 Inlet Stone Pitching – Supplying and laying rip-rap...
8 Display Board (1m × 1m × 0.3m)
8.A Earth work in excavation
8.B Supplying, constructing burnt clay brickwork...
8.C Supplying and laying plaster with cement mortar (1:6)...
8.D Wall writing with synthetic paint as per site in-charge
9 Grass Turfing – Fine Dressing of canal banks or embankment...
Total
GST %
%
GST Amount
Grand Total
Round Grand Total
@endsection